Client Representative for Sirte Oil Company for the Tripoli–Melita Gas Pipeline and Compressor Station Project — holding full piping control authority over the EPC contractor across the entire project lifecycle, from design through commissioning.
Authority covered piping, pipe supports, and associated structural elements across the pipeline and compressor station facilities.
Design control encompassed review and approval of stress and design criteria, piping and equipment specifications, 3D model reviews, engineering drawings, and technical documentation issued by the EPC contractor, ensuring strict conformity with contract requirements and project specifications at every stage.
Procurement and material control extended from requisition through site receipt, with material inspection and conformity verification against project requirements upon arrival, safeguarding the integrity of the supply chain feeding the project.
A defining responsibility of the role was independent verification of EPC contractor performance against contractual obligations — proactively identifying and quantifying cost and schedule impacts arising from EPC nonconformance with contract terms and project specifications, and reporting findings directly to the client to protect project interests.
Field execution oversight extended through construction, pre-commissioning, and commissioning, where direction was provided to the EPC contractor on hydrotest package preparation by system and subsystem, ensuring mechanical and pressure integrity prior to commissioning handover.
Final documentation and turnover packages were directed and verified across all systems, ensuring a fully traceable, code-compliant handover of the pipeline and compressor station to the client.