Greenfield construction of a new Aromatics processing unit, characterized by high piping density and heavy-wall systems typical of aromatics process technology.
The project required precise sequencing and tight spatial coordination to execute fabrication and erection safely and efficiently within a congested unit layout.
Engineering and construction controls were structured around spool-level tracking, work-front planning, and clear field instructions to maintain alignment betweean design intent and field execution across a high volume of piping systems.
Hydrotesting, punch-list resolution, and as-built documentation were managed to ensure mechanical completion met the rigor required for a complex, process-critical unit.
Execution maintained schedule integrity and construction quality despite the density and technical complexity inherent to aromatics plant piping systems.